TEAMFORCE Labour Limited are currently providing Murphy's with specialist Operatives for this Highly successful offshore Wind Farm project, located off the East Lincolnshire Coastline.,
The team are currently in installing the longest cable route in the UK.
The wind farm is made up of 90 wind turbines, and is positioned 20miles off the Lincolnshire coast and 28 miles from North Norfolk.
The Wind Farm will generate 857MW, which will be enough to power over 800,000 homes.
Video about the Triton Knoll Offshore Wind Farm project.